Then Tesla would just have GB/T, CCS1, and CCS2 benchmarks to deal with in producing. But as talked about, the Versions S and X would need design changes for A much bigger demand port.As of 2024 the Level two J1772 adapter (with NACS plug) is still employed at most general public AC charging stations and with non-Tesla dwelling/desired destination